Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at LHS of Eramosa Road, Moorooduc ME_EBA200
Date and Time Saturday 23rd June 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6 483 6.6 0.15 12 10 40
Weather overcast
Last rainfall During the last 24 hours
Flow estimate FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain
Water Appearance Muddy
Stream depth
Stream width 4
Hazards
Litter/Pollutants plastic,polystyrene
Creek in major flood.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au