Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
28 June 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Thursday 28th June 2012 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.08 | 960 | 7.8 | 0.1 | 12 | 9 | 7 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear,Oily |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | oil,other |
Ammonium and Phosphate tested at 18oC. This date was the shadow sampling day for 2012. A mistake was picked up in the Dissolved Oxygen method i was using, so i have not entered the amount. The creek had received quite high flows during the past week due to a heap of rain, so the creek was quite clear.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au