Site visit details

Overview

Catchment Yarra River
Site Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500
Date and Time Thursday 28th June 2012 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.08 960 7.8 0.1 12 9 7
Weather sunny
Last rainfall During the last week
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear,Oily
Stream depth
Stream width
Hazards
Litter/Pollutants oil,other
Ammonium and Phosphate tested at 18oC. This date was the shadow sampling day for 2012. A mistake was picked up in the Dissolved Oxygen method i was using, so i have not entered the amount. The creek had received quite high flows during the past week due to a heap of rain, so the creek was quite clear.

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Fair 6 Fair 3 Fair 6 Fair 24

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au