Site visit details

Overview

Catchment Barwon River
Site Point George/Anderson Reserve- drain on beach CO_IND040
Date and Time Monday 2nd July 2012 09:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 105 11.6 3200 7 0.03 10 10 12
Weather overcast
Last rainfall During the last 24 hours 18
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au