Waterwatch Data Portal
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Glen Iris Hedgley Dene Drain ME_YGL 100 |
Date and Time | Saturday 7th May 2011 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 890 | 8.4 | 0.3 | 12 | 13.6 | 15 |
Weather | cloudy |
---|---|
Last rainfall | |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au