Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
13 August 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 13th August 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 1270 | 8 | 0.02 | 10 | 8 | 20 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 3.2 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Foamy/frothy |
Stream depth | 0.20 |
Stream width | 4 |
Hazards | |
Litter/Pollutants | bottles,packets |
Water level in pondage high.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au