Site visit details

Overview

Catchment Yarra River
Site Baileys Billabong West ME_YYR809
Date and Time Friday 17th August 2012 09:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.27 6.8 200 7.2 0.05 9.5 9 28 24
Weather overcast
Last rainfall During the last 24 hours 2
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Milky
Stream depth 51cm - 99cm
Stream width 50
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au