Waterwatch Data Portal
CO_WAU020 Waurn Ponds Creek @ Pioneer Road Grovedale
12 September 2012
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Waurn Ponds Creek @ Pioneer Road Grovedale CO_WAU020 |
Date and Time | Wednesday 12th September 2012 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 3100 | 8 | 0.08 | 20 | 12 | 15 |
Weather | sunny |
---|---|
Last rainfall | During the last week 18 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | cans,packets,paper |
Road works on pioneer road is clearly affecting the health of the creek. Salinity levels extremely high, turbidity above average and reactive phosphorous above average.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au