Site visit details

Overview

Catchment Mallee
Site Walpolla east - Site 1 MA_EWW180
Date and Time Saturday 8th September 2012 10:15am
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 171 7.6 0.03 13.2 188
Weather overcast
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Milky
Stream depth >2m
Stream width >5m
Hazards
Litter/Pollutants
Creek really full. Beautiful egret sighted.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au