Site visit details

Overview

Catchment Loddon River
Site Pretty Jane creek on Separation Road Dunolly NC_PRE990
Date and Time Friday 21st September 2012 16:00pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 270 6.5 0.25 15.9 17 50
Weather cloudy
Last rainfall More than a week ago 2
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy,Scummy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
The phosphorus test is out of character but is correct I believe. The solution in the tube was very blue.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au