Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
27 September 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Thursday 27th September 2012 13:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 410 | 7.2 | 0.07 | 23.4 | 12.7 | 21 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 2.3 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | cans,packets,plastic,other |
Lots of dead trees in water. Willow tree has been removed and stump poisoned. The small waterfall across the creek is visible again.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au