Waterwatch Data Portal
Site visit details
Overview
Catchment | Thomson River |
---|---|
Site | Wades Creek @ Scrubby Lane WG_DR |
Date and Time | Sunday 7th October 2012 10:30am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 390 | 7.4 | 0 | 12 | 11.9 | 38 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 8 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Spitting at time of testing. Running just over bank height.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au