Site visit details

Overview

Catchment Lake Colac
Site Murray St drain Colac CO_MRY010
Date and Time Thursday 31st May 2012 14:00pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Area under bridge does not grow much vegetation at all. Area away from bridge vegetation good.
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Excellent 5 VeryPoor 2 Good 8 Excellent 5 Good 8 Fair 28

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au