Waterwatch Data Portal
ME_ETO300 Toomuc Creek opposite the performing arts centre at Beaconhills College
24 October 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300 |
Date and Time | Wednesday 24th October 2012 03:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 8 | 400 | 7.92 | 0.05 | 20 | 15 | 24 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | muddy banks |
Litter/Pollutants | paper,plastic |
The site has had lots of heavy rain in the past months; banks are eroded.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au