Waterwatch Data Portal
MA_PFO600 Foster Street Settling pond rehabilitation site 2
8 October 2012
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Foster Street Settling pond rehabilitation site 2 MA_PFO600 |
Date and Time | Monday 8th October 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 456 | 6.7 | 0.3 | 9 | 40 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Smelly |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
there has been a fire in ~25m of drain. Pond is covered in Red Azolla frog calls
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au