Waterwatch Data Portal
CO_BAR142 Barwon River at McIntyre footbridge.
12 November 2012
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River at McIntyre footbridge. CO_BAR142 |
Date and Time | Monday 12th November 2012 10:45am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 74 | 6.7 | 1660 | 7.4 | 0.01 | 25.5 | 19 | 21 |
Weather | windy |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Milky,Stained brown |
Stream depth | 0.9 |
Stream width | >5m |
Hazards | very windy |
Litter/Pollutants | plastic |
Training session, habitat survey also completed.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au