Waterwatch Data Portal
ME_YSC099 Mt Waverley Wetlands at the rocky embankment at the most westerly end, nearest Blackburn Rd
18 November 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mt Waverley Wetlands at the rocky embankment at the most westerly end, nearest Blackburn Rd ME_YSC099 |
Date and Time | Sunday 18th November 2012 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.03 | 690 | 7.4 | 18 | 16 | 22 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | bottles,cans,packets,paper,plastic |
Overnight flow into the wetlands was insufficient to top up the ponds. Flow had stopped at the time of visit.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au