Site visit details

Overview

Catchment Yarra River
Site Donaldson's Creek@ Kenilworth Pde, Ivahoe ME_YDO990
Date and Time Saturday 1st December 2012 14:45pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 8 200 7.2 0.07 31.2 19.7 7
Weather sunny
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,plastic,polystyrene
Turbidity tube overflowed. Streamside weed control and planting has been carried out on east bank in conjunction with Melbourne Water. pH and EC solutions expire on 2/12/2012. Will arrange with co-ordinator for fresh samples.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au