Site visit details

Overview

Catchment Bunyip River
Site Rhyll Wetland ME_ERH200
Date and Time Wednesday 20th July 2011 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 3 4700 5.7 0.8 11 10.6 15
Weather cloudy
Last rainfall During the last week 8.8
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants
More water than last winter. Phosphate was diluted 4x. Saw Ibis, Cormorants, BTFx1

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au