Site visit details

Overview

Catchment Yarra River
Site Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800
Date and Time Wednesday 5th December 2012 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 7 470 7.3 0.05 12.8 15.7 19
Weather overcast
Last rainfall During the last 24 hours 0.4
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,packets,paper,plastic,polystyrene,other
Recent drop in water level. Muddy banks and more bank erosion. English Ivy starting to grow down the bank. Kookaburras, Corella and a Pacifi Black duck present.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au