Waterwatch Data Portal
CO_SWA060 Blairwood Creek @ Portarlington Rd
20 December 2012
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Blairwood Creek @ Portarlington Rd CO_SWA060 |
Date and Time | Thursday 20th December 2012 14:15pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 3.5 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Pools unsuitable for testing
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au