Waterwatch Data Portal
GB_DAB015 Dabyminga Creek at Ennis Road Ford
19 December 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dabyminga Creek at Ennis Road Ford GB_DAB015 |
Date and Time | Wednesday 19th December 2012 10:45am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 670 | 0 | 20.1 | 5 |
Weather | |
---|---|
Last rainfall | During the last week |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Very low. Small pools under bridge, dry downstream. Observed medium pool upstream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au