Waterwatch Data Portal
GB_CRE011 Creightons Creek at Bartons Lane
18 November 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 18th November 2012 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 180 | 6.5 | 13 | 11 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~ 8mm in September, from 21st Oct to 18th Nov. EC very similar to October. Turbidity Upper Creek lower NTU, but higher from CRE013 downstream
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au