Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at bollards near trestle bridge, Pyalong GB_MOL009
Date and Time Tuesday 15th January 2013 11:31am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Air ° C Water ° C Turb NTU
Sample 1220 0 26.4 21.8 30
Weather sunny
Last rainfall More than a week ago
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Scummy,Stained green
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards
Litter/Pollutants
I moved test site further upstream as original site all but dried up.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au