Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 10 m upstream of Monbulk Creek ME_DHV090
Date and Time Tuesday 22nd January 2013 11:40am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 5.7 1160 7.9 0.05542 17 18 9
Weather sunny
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 1.5
Hazards
Litter/Pollutants paper,plastic,other
horse manure dumped on creek bank right on site at least some has got into creek

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au