Site visit details

Overview

Catchment Thomson River
Site Avon Rr - Wombat Crossing-Valencia Ck WG_AVR170
Date and Time Monday 28th January 2013 00:30am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
D.O. % EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample
Weather cloudy
Last rainfall During the last 24 hours 1
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
-Gippsland fires occured previous to sampling- burnt leafs where visible at sight -Reduced rainfall/poor monthly rainfall occured during the month of January.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au