Waterwatch Data Portal
ME_EBA900 Balcombe Creek at Augusta St Bridge, Mt Martha
27 January 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900 |
Date and Time | Sunday 27th January 2013 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 25 | 2 | 58000 | 7.5 | 0.07 | 23 | 21 | 0 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Mouth of Creek into Port Phillip Bay was blocked at time of testing and had been for approximately 3 weeks and thus the creek was not flowing and the tidal effect in this part of the creek had not played apart for such time as it normally does through the rest of the year. Rainfall since last testing at this site was approx 12.8 mm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au