Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300
Date and Time Monday 11th February 2013 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 59 6 6800 6.9 0.03 22 13 10
Weather cloudy
Last rainfall During the last week 0.2
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth 0.18
Stream width 0.65
Hazards
Litter/Pollutants bottles
Coral fern on banks starting to dry out and brown. Lots of water borne leaf debris piled downstream of test site. One beer bottle removed from creek

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au