Waterwatch Data Portal
ME_EBA850 Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9)
3 March 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9) ME_EBA850 |
Date and Time | Sunday 3rd March 2013 09:18am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 45 | 4 | 1630 | 7.1 | 0.03 | 21 | 18 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Turbidity is down since last reading with an increase in oxygen saturation. 41.3 mm of rain has fallen since last reading and the entrance to the Estuary is closed and has been since November 2012.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au