Site visit details

Overview

Catchment South Gippsland
Site Tarwin Lower boat ramp, past pub. GC WG_TWN251
Date and Time Tuesday 29th May 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 320 6.6 12.8 11.9 160
Weather raining
Last rainfall During the last 24 hours
Flow estimate
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
did test phos: 0.11 x 5 = 0.55mg/l

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au