Site visit details

Overview

Catchment Goulburn River
Site Sawpit Gully Ck at Sawpit Gully Rd, Boho GB_SAW020
Date and Time Friday 1st March 2013 16:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 31 2.7 825 6.5 87 21.7 0.36 34
Weather sunny
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Other: Ash
Stream depth 0 - 50cm
Stream width 1
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au