Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 10 m upstream of Monbulk Creek ME_DHV090
Date and Time Tuesday 5th March 2013 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 64 6.1 910 7.6 0.09128 21 18 10
Weather sunny
Last rainfall During the last week 21
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,cans,paper,plastic
rubbish due to bank overflow from rain in late feb

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au