Site visit details

Overview

Catchment Bunyip River
Site Cannibal Creek at Wimpole Rd, Garfield North ME_ECN500
Date and Time Saturday 16th March 2013 11:35am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 141 7.1 0.05 15.5 15.5 15
Weather overcast
Last rainfall More than a week ago 17
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Other: Slightly cloudy - turbid.
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants
N.B. Missed doing the water monitoring in early December 2012. These results above reflect the summer period. The showers had ceased. It last rained on 28/2/2013. There was no change from last time.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au