Waterwatch Data Portal
GB_DRY025 Dry Creek at McKenzies Bridge, Hamilton Street, Broadford
20 March 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025 |
Date and Time | Wednesday 20th March 2013 09:50am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 690 | 7.5 | 0 | 17.8 | 14.5 | 0.05 | 25 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Kirsten sampled as Peter away
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au