Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Sunday 28th April 2013 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 55 5 9500 7.4 0.02 18 18 0
Weather overcast
Last rainfall During the last week 15
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Oily,Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
Entrace to Port Philip Bay still closed. Creek Depth increased will still no flow.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au