Waterwatch Data Portal
ME_EBA900 Balcombe Creek at Augusta St Bridge, Mt Martha
28 April 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900 |
Date and Time | Sunday 28th April 2013 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 55 | 5 | 9500 | 7.4 | 0.02 | 18 | 18 | 0 |
Weather | overcast |
---|---|
Last rainfall | During the last week 15 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Oily,Stained brown |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Entrace to Port Philip Bay still closed. Creek Depth increased will still no flow.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au