Waterwatch Data Portal
Site visit details
Overview
Catchment | Lake King |
---|---|
Site | Jones Bay 'The Cut EG_JOB056 |
Date and Time | Monday 13th May 2013 15:42pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 88.6 | 8.27 | 7360 | 8.8 | 0.08 | 18.1 | 17.8 | 55 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | cans,packets,paper |
No apparent reason for the turbidity level to be high- no works or rain fall- cannot explain.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au