Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at Weir Wall Power St, Pyalong GB_MOL005
Date and Time Thursday 23rd May 2013 15:14pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Air ° C Water ° C Turb NTU
Sample 2700 20 10.1 9.1 12
Weather cloudy
Last rainfall During the last week 20
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy
Stream depth >2m
Stream width 2m - 5m
Hazards
Litter/Pollutants
dredging done downstream of test site.

Diary photos

No diary entries recorded for this visit