Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
25 May 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 25th May 2013 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 6 | 370 | 7.2 | 0.02 | 15.2 | 9.8 | 23 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.60 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | bottles,plastic,other |
Other litter included car tyre, orange road safety mesh, blue packing webbing, white plastic garden pot, orange bottle top & a coke plastic bottle. Anna joined us to undetake shadow testing...pointed out that a cap should be fitted to a star steel post (this is a hazard we past on the way to the site). Our v Anna's air temp. (15.2 v 16.5) & water (9.8 v 10) + dissolved oxygen (6 v 8) + turbidity (23 v 17) were the variances while the other results were the same. Our water samples were shaken for Turbidity, filtered & warmed for Phosphate & Ammonium.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au