Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 10 m upstream of Monbulk Creek ME_DHV090
Date and Time Wednesday 1st May 2013 00:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 66 7.3 870 7.5 0.06194 10 11 10
Weather windy
Last rainfall Raining Now 3.7
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Stained green
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants other
testing done post polluton event of 26th April. This site 500 metres downstream of probable dump site of contaminent (likely to be engine coolant)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au