Waterwatch Data Portal
ME_EWA300 Warringine Creek downstream of Frankston-Flinders/Watts Rd
2 November 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300 |
Date and Time | Friday 2nd November 2012 11:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 2260 | 7.4 | 0.1 | 24 | 16 | 5 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au