Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450
Date and Time Monday 10th June 2013 11:18am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 76 9 2400 7.8 0.02 13 8 7
Weather cloudy
Last rainfall During the last week 26.6
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear,Foamy/frothy
Stream depth 0 - 50cm
Stream width 0.6
Hazards Steep slope next to roadside
Litter/Pollutants bottles,cans,paper,plastic,polystyrene
most rubbish seems to have been washed up from the Bay.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au