Waterwatch Data Portal
ME_ETO300 Toomuc Creek opposite the performing arts centre at Beaconhills College
30 July 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300 |
Date and Time | Tuesday 30th July 2013 15:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 9 | 430 | 7 | 0.05 | 14 | 13 | 17 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 3 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy,Foamy/frothy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | slippery slopes |
Litter/Pollutants | cans,paper,plastic,polystyrene,other |
gate is still in stream and because we picked up rubbish last monitoring there was not as much.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au