Waterwatch Data Portal
GB_FOR015 Fords Creek at Withers Lane before Wastewater Treatment Plan
27 March 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Fords Creek at Withers Lane before Wastewater Treatment Plan GB_FOR015 |
Date and Time | Wednesday 27th March 2013 18:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 420 | 7.1 | 0 | 21.5 | 338 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Bridge works in progress upstream at Greenvale Lane
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au