Site visit details

Overview

Catchment Goulburn River
Site Fords Creek after Mansfield at Maindample Park. GB_FOR024
Date and Time Wednesday 27th March 2013 18:20pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm GB Height m pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 570 0.05 8 0 21.1 0.21 275
Weather
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Bridge works in progress upstream at Greenvale Lane

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au