Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
14 August 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Wednesday 14th August 2013 13:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.05 | 8 | 590 | 7.3 | 0.06 | 14.3 | 9.9 | 50 |
Weather | windy |
---|---|
Last rainfall | During the last week 19.8 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Foamy/frothy,Stained brown |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,other |
Phosphate and Ammonium were heated. Acacia dealbatas on river banks are in poor condition - Severely affected by frost or insect damage. A lot of die back is present from the tips down on most trees.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au