Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Monday 27th August 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 81 7 695 0.05 12 11.6 10
Weather sunny
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Foamy/frothy
Stream depth 0 - 50cm
Stream width 1.3
Hazards
Litter/Pollutants
pH meter mislaid, no test taken faulty probe for pH on conductivity meter, new probe ordered

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au