Waterwatch Data Portal
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | kmb drain ME_EKM500 |
Date and Time | Wednesday 21st August 2013 09:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 400 | 7.6 | 0.1 | 9 | 9.4 | 60 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 23.8 |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Muddy,Stained brown |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Due to heavy rain over the last few days the water was overflowing and across Kitty Miller Bay Road.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au