Site visit details

Overview

Catchment Goulburn River
Site Honeysuckle Ck 500m upstream of Hayes Rd Bridge GB_HON009
Date and Time Monday 22nd July 2013 17:05pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Water ° C Turb NTU
Sample 130 4 9.2 52
Weather
Last rainfall
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Steady bankfull flow. Site has become more turbid since rain.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au