Waterwatch Data Portal
ME_EBA900 Balcombe Creek at Augusta St Bridge, Mt Martha
22 September 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900 |
Date and Time | Sunday 22nd September 2013 09:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 82 | 8 | 740 | 7.6 | 0.05 | 15 | 14 | 15 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 15 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Heavy rainfall over last week with heavy flow from stormwater drain above site. Site appears to be chocolate coloured appearance of water.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au