Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9) ME_EBA850
Date and Time Sunday 22nd September 2013 09:34am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 80 8 700 7.2 0.1 15 14 20
Weather overcast
Last rainfall During the last 24 hours 15
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
Recent appearance of bank flooding up to 300mm above normal bank.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au