Site visit details

Overview

Catchment Bunyip River
Site Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300
Date and Time Tuesday 29th October 2013 16:39pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6 360 7 0.6 16 15.3 15
Weather cloudy
Last rainfall During the last 24 hours 2
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear,Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards 1.5m drop
Litter/Pollutants bottles,cans,packets,paper,plastic,polystyrene,other
gate still there, found school drain form frog pond

Habitat

long reeds
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Good 8 Good 4 Fair 6 Fair 27

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au